Summers Superchisel - 5-Section Manual do Utilizador Página 27

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 26
2-15
SECTION 2 – SET-UP OF PART 2 WING
NOTE: Drawing for steps 12 through 21 is on previous page.
12. Attach 11L x 15 wheels onto hubs with 9/16” wheel bolts (torque required: 122 ft-lbs).
NOTE: STEPS 14 THROUGH 18 MAY HAVE BEEN PRE-ASSEMBLED AT FACTORY.
13. Install gauge wheel support (8T4090) onto wing with 7/8” x 2-1/2” bolts.
14. Apply anti-seize to jack bolt (8T6000) threads. Screw jack bolt into axle holder (8T4094) far
enough to see hole on bottom of bolt through hole in axle holder.
– Insert 3/16” x 2” roll pin. Insert pin far enough so it will clear tube when rotated.
15. Place gauge wheel depth decal on axle holder.
– Locate decal 1” from bottom of 4x4 tube.
– Make sure that decal faces the front of the machine.
Attach decal off to one side of axle holder to avoid seam on support tube.
16. Slide axle holder and jack bolt into gauge wheel support. Slide 1-1/4” at washer onto bolt and
turn 1-1/4” slotted nut on.
– Do not tighten slotted nut.
17. Add gauge wheel screw top onto jack bolt.
– Insert 1/2” x 2-1/4” bolt into screw top and bolts. Secure with locknut.
18. Attach gauge wheel jack handle to screw top.
– Install 3/8” x 2” bolt in handle and screw top. Secure with locknut.
– Do not over tighten. Handle must pivot freely.
19. Check free operation of gauge wheel assembly.
– Loosen or tighten slotted nut for optimum performance of gauge wheel.
– Install 3/16” x 2” roll pin after slotted nut is adjusted properly.
20. Insert 8K1100 (6 bolt) axle and hub assembly into each receiver tube. Apply good quality anti-
seize to axles before installation. Retain axle into receiver tube with 1/2 x 3-3/4” bolt and
locknut.
21. Attach 11L x 15 wheel onto hub with 9/16” wheel bolts (torque required: 122 ft-lbs).
Vista de página 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 97 98

Comentários a estes Manuais

Sem comentários